Thursday, October 16, 2008

Coffered Ceiling

New ceiling above dinette


Drywell

Bill checking out the new system. Most of the house gutters will feed into it.
Underground work by Arno excavation

Jyune finding a nice cozy spot.


Tuesday, October 14, 2008

Monday, October 13, 2008

Audio/ Visual

Fireplace mantle/television cabinet,with speaker shelves on opposite ends of room.
Steven making 18" radius shelves


Nice B&W speakers

Kitchen Install




Thermador double oven and wine fridge


Friday, October 10, 2008

Cabinets & Appliances

Making sure everything lays out correctly.
It's just like christmas. Lots of unwrapping.

A truckload of cabinets.


Thursday, October 9, 2008

Exterior Paint

Gilbert from Souto Painting applying 1st coat.
Mudroom prepped and ready for primer

Brick gets wrapped for protection.


Monday, October 6, 2008

Mudroom Cabinets

Shoe cabinet. For those large size 13's
Locker Style Cabinets with bench seat.




Saturday, October 4, 2008

Custom Climates

Scott Zona, owner of custom climates installing air handler for whole house air conditioning.
Scotts' right hand man Paul.

Hardwood Flooring

Tucker and Wellerson installing white oak hardwood flooring.


Tuesday, September 30, 2008

Shop Cabinetry

Ready for paint
Now the fun stuff.

2 weeks shop time. Now we can transport and install.







Matt giving a helping hand.



Friday, September 26, 2008

Plaster Finish


Noell from Stoney Plastering putting finishing touch on barrel vaulted ceiling.